ASQ CCQM Übungsprüfungen
Zuletzt aktualisiert am 27.04.2025- Prüfungscode: CCQM
- Prüfungsname: Certified Construction Quality Manager
- Zertifizierungsanbieter: ASQ
- Zuletzt aktualisiert am: 27.04.2025
How should a construction quality manager handle design change requests (DCRs) that propose enhancements outside the original project scope?
- A . Approve the DCRs to meet the design team’s preferences.
- B . Reject the DCRs to adhere to the original project scope and timeline.
- C . Evaluate the DCRs to ensure quality checks are identified.
- D . Allow the design team to make decisions on the DCRs.
Which of the following methods is characterized by the owner holding separate contractual agreements with the designer and the contractor?
- A . Design-Bid-Build
- B . Design-Build
- C . Construction Manager at Risk
- D . Engineering, Procurement, Construction Management
What method should be used to evaluate the effectiveness of project controls in meeting quality expectations during the design phase?
- A . By assessing if project controls align with quality objectives and stakeholder expectations
- B . By determining how often project controls are revised to reflect current trends
- C . By focusing primarily on how quickly the project meets timelines instead of quality outcomes
- D . By comparing the project’s controls with those of unrelated projects for best practices
When evaluating welding procedures in a structural steel construction project, what should be the primary focus to ensure alignment with the quality management processes?
- A . The appearance of the welds to guarantee they are uniform
- B . The welding techniques preferred by the skilled welders
- C . The cost-effectiveness of the welding materials and equipment
- D . The compliance of welding practices with specified standards
ow should CoQ data be interpreted to derive meaningful insights?
- A . Summarize the data into high-level categories to simplify reporting
- B . Analyze trends over time and correlations with project outcomes
- C . Focus interpretation on the highest cost areas
- D . Interpret data in isolation from other project metrics
Which of the following attributes of measurement systems is primarily evaluated during a measurement systems analysis?
- A . Cost-effectiveness
- B . Precision
- C . Aesthetic design
- D . Supplier diversity
Which of the following approaches would best assess the alignment of permanent work specifications with a project’s quality plan?
- A . Evaluating the integration of technology in the construction processes
- B . Conducting periodic inspections of work progress for adherence to specifications
- C . Reviewing compliance reports against the quality plan
- D . Reviewing corrective actions implemented from previous quality audits
What should be the primary focus when organizing pre-inspection meetings in a construction project?
- A . Prioritizing feedback from senior management to secure their approval of the inspection process
- B . Keeping that meeting time as short as possible to minimize disruption to the construction schedule
- C . Focusing primarily on recent findings to address critical issues before the next inspection
- D . Reviewing upcoming inspections, current quality metrics, and addressing any open issues
What should be included in the design of a strategy for conducting site quality audits in a dynamic construction environment?
- A . Conduct audits randomly to catch teams unprepared and identify genuine issues.
- B . Focus audits on areas where previous problems were identified to verify that root causes have been resolved.
- C . Plan regular, systematic audits and include mechanisms for immediate feedback and corrective actions.
- D . Prioritize audits of subcontractor activities while providing general oversight of other project areas.
Which of the following environmental, social, and governance (ESG) practices primarily impacts governance in project management?
- A . Implementing energy-efficient technologies
- B . Promoting diversity and inclusion in the workforce
- C . Ensuring transparency in reporting and accountability
- D . Reducing waste through recycling initiatives