DELL EMC D-PSC-MN-01 Übungsprüfungen
Zuletzt aktualisiert am 24.04.2025- Prüfungscode: D-PSC-MN-01
- Prüfungsname: Dell PowerScale Maintenance
- Zertifizierungsanbieter: DELL EMC
- Zuletzt aktualisiert am: 24.04.2025
A platform engineer does not have a Flash drive available.
How can they reimage a Dell PowerScale node?
- A . Copy the OneFS install file to the node and run the isi_reimage command.
- B . Copy the OneFS install file onto CD and install from CD.
- C . Use a serial connection to run the installation from a laptop.
- D . Copy the OneFS install file to the node and run the isi diskutil command.
DRAG DROP
What Is the correct order of steps to Install a PowerScale Gen6 in a rack?
DRAG DROP
What Is the correct order of steps to Install a PowerScale Gen6 in a rack?
Dell EMC Technical Support has requested a part to be sent directly back to Dell Logistics to be studied.
Which process or document needs to be completed prior to sending the part back?
- A . WWF
- B . CDMR
- C . DMR
- D . WWFA
When testing connectivity to the Dell EMC PowerScale cluster through the Web Administration interface, what should be typed in the address line of the browser?
- A . https://<clustername>:8080
- B . http://<clustername>:80
- C . http://<clustername>:8082
- D . https://<clustername>:8081
Which document was replaced by the PEQ?
- A . Site Preparation and Planning Guide
- B . Web Administration Guide
- C . Supportability and Compatibility Guide
- D . Configuration Guide
Which statement is accurate regarding Dell EMC PowerScale hardware platforms?
- A . Gen 6 node hardware comes only in 4U rack-mountable chassis.
- B . Gen 6.5 F200 nodes come in 4U rack-mountable chassis.
- C . Gen 6 node hardware comes in 2U or 4U rack-mountable chassis.
- D . Gen 6.5 F600 nodes can only be added as node pairs.
An engineer replaced a failed node in a PowerScale H500 due to hardware issues. They must verity that the replacement node is functioning correctly.
What is a crucial step when replacing the failed node in the cluster?
- A . Run a diagnostic test on the replacement node.
- B . Confirm that the replacement node inherits the old serial number from the cluster.
- C . Verify the size of the storage capacity of the replacement node.
- D . Power on the replacement node and ensure it connects to the network without any problems.
A platform engineer is at a customer site to replace a failed Dell EMC PowerScale Gen 6 node. After removing the compute module, they observe lit LEDs inside the removed node.
What is the recommended response?
- A . This is not normal; they need to shut down the partner node.
- B . There is an internal electrical fault; they should call support.
- C . The node is not yet completely shut down; they should wait.
- D . This is normal; they should continue with the procedure.
A platform engineer is at a customer site to replace a failed Dell EMC PowerScale Gen 6 node. After removing the compute module, they observe lit LEDs inside the removed node.
What is the recommended response?
- A . This is not normal; they need to shut down the partner node.
- B . There is an internal electrical fault; they should call support.
- C . The node is not yet completely shut down; they should wait.
- D . This is normal; they should continue with the procedure.