What data protection option is included with VxRail?
- A . PowerProtect Software Data Domain Cloud Tier
- B . vSphere Replication NetWorker
- C . RecoverPoint for VM Avamar
- D . RecoverPoint for VM vSphere Replication
What issue is one of the top reasons for failing to deploy SRS/VE in a VxRail environment?
- A . Excessive latency
- B . DNS resolution failure
- C . LCM errors
- D . NTP drift
For which VxRail models must the iDRAC NIC Selection be set to Dedicated?
- A . D, G, P, S, and V Series
- B . E, P, S, and V Series only
- C . D, E, P, S, and V Series
- D . D, E, and G Series
During a node add procedure the new node cannot be discovered. A ping to the IPv6 address is responding.
What could be the cause of this issue?
- A . Only one network interface is up on the new node
- B . vSAN VLAN is not configured correctly
- C . Management VLAN ID is not set on the vmk0 interface
- D . Loudmouth process is not running
How can an administrator manually verify DNS records for a VxRail implementation?
- A . ping
- B . ipconfig/all
- C . nslookup
- D . ping -a
Based on the exhibit, what is the correct IP address to use when resetting a G Series node with the reset script?
- A . 169.254.234.124
- B . 192.168.20.35
- C . 192.168.30.35
- D . 192.168.80.35
An existing Dell EMC customer wants to deploy a new VxRail cluster on premise. Each node of the new cluster will be configured with a single disk group containing one 1.6 TB Flash drive for the capacity tier. The customer plans on using mirroring and needs to have at least 2 TB of usable capacity in the vSAN datastore.
What is the minimum number of VxRail nodes required?
- A . 2
- B . 3
- C . 4
- D . 5
An implementation engineer is tasked with expanding an 8-node VxRail E560 cluster with an S570 node. The cluster has been configured with 1 GbE networking.
Which two should be considered when planning to expand the cluster? (Select 2)
- A . Node limit has been reached on the cluster
- B . AMD and Intel based nodes cannot be mixed
- C . E Series nodes require more capacity before expansion
- D . All nodes in the cluster must be the identical series
A company has multiple VxRail systems installed at geographically dispersed data centers They want to upgrade all their VxRail systems to the latest release- Before the upgrade, they want an inventory report of all the VxRail systems which shows the current health status and versions of all installed VxRail components.
What should be used to meet these requirements?
- A . itrend
Live Optics - B . VxRail Plugin for vCenter Server
VxRail API - C . VxRail Plugin for vCenter Server
DRM Services - D . Mitrend
VxRail Log insight
When adding an S Series node to a Gen 2 VxRail 240F cluster the build fails.
What could be a possible cause of this situation?
- A . IP Pool has no more free addresses
- B . Hybrid and Flash nodes cannot be mixed in the same cluster
- C . Quanta and Dell hardware cannot be mixed in the same cluster
- D . Loudmouth process needs to be restarted