What is problem tracking?
- A . It’s the identification of missing requirements.
- B . It’s the assumption that there will be defects in the requirements that must be resolved.
- C . It’s the documentation of known defects in the requirements.
- D . It’s the identification and management of any issues for resolution.
During the analysis, synthesis, and refinement of elicitation results the business analyst (BA) has discovered that some information is missing.
Which course of action would resolve the situation?
- A . Verify the requirements results
- B . Conduct elicitation activities
- C . Conduct traceability analysis
- D . Validate the requirements
The business analyst (BA) is preparing for a requirements review with a group of stakeholders. The
BA must determine how best to model the requirements for the review.
Which of the following guidelines and tools will the BA use?
- A . Current state description
- B . Domain knowledge
- C . Methodologies and framework
- D . Requirements architecture
A business analyst (BA) has completed multiple workshops involving a number of stakeholders including the project manager however, the elicitation results are inconsistent between the stakeholders.
How should the variation in results be resolved?
- A . The project manager should decide which requirement is relevant.
- B . The BA should select which requirements are correct.
- C . The project manager should model requirements in a review meeting.
- D . The BA should model the elicited requirements in a review meeting.
The human resources department of an organization needs a new report. The business analyst (BA) assigned to this effort has scheduled a requirements workshop with the users. Users from the legal department have also been invited to the workshop. As the BA sets up the workshop, what can be done in advance to ensure a productive and focused workshop?
- A . Document the feedback
- B . Facilitate the workshop
- C . Create an agenda
- D . Reserve a location
A long-established company selling ice cream is entering its crucial sales period leading up to summer. Based on the company’s risk tolerance, a business analyst (BA) has advised against replacing the most popular flavors with new untested flavors.
What is the company’s attitude toward risk, as assessed by the BA?
- A . Risk-neutral
- B . Risk-optimizing
- C . Risk-averse
- D . Risk-soaking
A business analyst (BA) has been tasked with examining and analyzing the relationship between a set of requirements by verifying that they are unambiguous.
What will the BA be looking for?
- A . That there are no relationships that link elements two different and conflicting
- B . That relationship is described in the same way, using the same set of standards
- C . That there is a genuine relationship and that the type of the relationship is described
- D . That the relationship is necessary for understanding the requirements holistically
A business analyst (BA) is working on a project to provide a temporary solution that will last for two months. The BA is feeling overwhelmed with the work needed to create the huge number of links to provide full traceability from solution requirements to design for this solution.
How can the BA justify omitting all possible links?
- A . Such traceability is at a lower level of abstraction for this project
- B . The value each link is delivering in this situation is not high
- C . Traceability is a low priority as the BA has other work to complete
- D . It is impossible for anyone to confirm if such links are correct
A business analyst is helping management determine which solution they should choose. As it happens that the organization can only choose one of the two solutions due to time and resource restrictions. Solution A worth $456,000 to the organization while solution B worth $565,000 to the organization. While solution A costs less, it is less risky and takes less time to complete so management elects to seize Solution A.
What is the opportunity cost?
- A . $565,000
- B . There is not enough information to know how much the solution will cost the organization.
- C . $109,000
- D . $456,000
A change to support a regulatory requirement is proposed for inclusion in the scope of a project. A business analyst (BA) conducts an impact analysis to determine the extent of the change.
What previous task could assist the BA in performing the impact analysis?
- A . Perform a risk analysis
- B . Conduct a cost-benefit analysis
- C . Create use case scenarios
- D . Create requirement relationships