DRAG DROP
A manufacturing company uses Dynamics 365 Supply Chain Management. The company operates three eight-hour shifts per day, Monday through Friday.
The company purchased equipment for a new process that cannot be performed with existing equipment. This specialized equipment performs only this unique task. The machinery must always be monitored and controlled by a worker.
The machine must be added to the existing production line and be ready as soon as possible. Future planned production orders must not overload the running maximums of the new machine.
You need to configure the system.
Which four actions must you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
A manufacturing company uses master planning in Dynamics 365 Supply Chain Management.
Purchase orders for a raw material are created more frequently than needed. This results in missed discounts with the vendor who sells the raw material.
The raw material items have a 30-day lead time. The company is willing to delay sales and production order demand that may consume the raw material for up to 15 days to consolidate purchase orders.
You need to configure the setup to include lead time and consolidate purchase orders.
What should you configure?
- A . negative days only
- B . positive days
- C . dynamic negative days and negative days
- D . dynamic negative days only
DRAG DROP –
A manufacturing company is implementing Dynamics 365 Supply Chain Management.
You have a bill of materials (BOM) for each finished good. Finished goods may have subcontracted operation steps.
You need to configure the BOM lines.
What should you configure? To answer, drag the appropriate configurations to the correct requirements. Each configuration may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content. NOTE: Each correct selection is worth one point.
HOTSPOT
A company produces homeopathic lotions for pain relief and uses Dynamics 365 Supply Chain Management.
You have been provided the following information for a new relieving lotion.
Use the drop-down menus to select the answer choice that completes each statement based on the information presented in the graphic. NOTE: Each correct selection is worth one point.
A company uses Process manufacturing for most products and Discrete manufacturing for other products. The company is creating a formula for a new product. The new item will be used to make a name brand product and two generic brand products. This item has the following requirements:
Production of the name brand and generic products must use the same formula.
The company must produce all three items at the same time.
You need to create a produced item that can make two generic items and one main item.
How should you set up the item?
- A . Create the name brand item as a Bills of material production type item.
Add the two generic items on the Bills of material for the name brand product and use line type phantom. - B . Create the name brand item as a formula planning production of type formula.
Create the two generic items as a formula planning production of type formula.
Copy the formula from the name brand item into each of the generic items. - C . Create the name brand item as a Bills of material production type item.
Create the two generic items as a sub-assembly on the Bills of materials for the name brand product. - D . Create a product as the main product and use a planning item production type.
Create the name brand and two generic products as co-products for the planning item.
A manufacturer uses Dynamics 365 Supply Chain Management.
The engineering department constantly revises product designs to stay current with the latest technology. The customer service department places orders for the products but frequently adds a prototype product version that is not yet operational.
The manufacturer requires a solution that notifies customer service if a prototype version is selected on a sales order.
You need to configure the solution.
What should you configure?
- A . product release policy
- B . product lifecycle states
- C . version number rule
- D . engineering product category
HOTSPOT
A company uses Dynamics 365 Supply Chain Management.
The company plans to use the Asset management module to maintain its installed base of milling machine fixtures.
The module must be configured to handle the following requirements:
An oil sampling must be taken from each machine at regular intervals.
All calibration types (tooling, instrumentation, and tolerances) that share a required performance skillset must be managed together.
The company is unable to perform in-house preventive maintenance skills on the pneumatic tapping machines. Therefore, the company hires outside services for it.
All maintenance must be scheduled at the same time for efficiency and cost savings.
You need to configure the system.
Which option should you configure? To answer, select the appropriate options in the answer area. NOTE: Each correct selection is worth one point.
DRAG DROP
A process manufacturing company is implementing Dynamics 365 Supply Chain Management. The company will use multiple process manufacturing functionalities including by-products.
You need to configure by-product formula allocation methods.
Which methods should you use? To answer, drag the appropriate by-product burden allocation methods to the correct scenarios. Each method may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content. NOTE: Each correct selection is worth one point
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A manufacturing company has a new speaker that is available with standard and premium carbon fiber options.
For the premium option, speakers are made to order. Customers can choose from seven product attributes at different prices.
You need to create and configure the product and pricing for the new speaker.
Solution: Create a constraint-based product with configurations. Use a price model to calculate the different configurable option costs.
Does the solution meet the goal?
- A . Yes
- B . No
HOTSPOT
Case Study
This is a case study. Case studies are not timed separately. You can use as much exam time as you would like to complete each case. However, there may be additional case studies and sections on this exam. You must manage your time to ensure that you are able to complete all questions included on this exam in the time provided.
To answer the questions included in a case study, you will need to reference information that is provided in the case study. Case studies might contain exhibits and other resources that provide more information about the scenario that is described in the case study. Each question is independent of the other questions in this case study.
At the end of this case study, a review screen will appear. This screen allows you to review your answers and to make changes before you move to the next section of the exam. After you begin a new section, you cannot return to this section.
To start the case study
To display the first question in this case study, click the Next button. Use the buttons in the left pane to explore the content of the case study before you answer the questions. Clicking these buttons displays information such as business requirements, existing environment, and problem statements. If the case study has an All Information tab, note that the information displayed is identical to the information displayed on the subsequent tabs. When you are ready to answer a question, click the Question button to return to the question.
Background
Fabrikam Inc. is a manufacturer of sanitation cleaning solutions and equipment including carpet/floor cleaners, pressure washers, scrubbers and vacuums.
Fabrikam Inc. is a single legal entity based in New York city.
_ Current environment
Products manufactured
• Cleaning equipment o floor cleaner
o pressure washers o scrubbers
o vacuums
• Liquid cleaning solutions o No scent
o Orange scent (subcontracted to a vendor named Vendor A)
o Pine scent (subcontracted to a vendor named Vendor A)
The production quantity for the finished unscented liquid cleaning solution is 40-liters. Ingredient C ‚or unscented liquid cleaning solution Is stored in inventory in 50-liter barrels and allocated in 50-liter increments. Two barrels of Ingredient C are uses to produce a barrel of unscented liquid cleaning solution.
Production sites
• The Eastern United States facility manufactures equipment.
• The Western United States facility manufactures liquid cleaning solutions.
• Raw materials and finished products are stocked at the warehouse and distributed from the warehouse.
Warehouse facilities
The warehouse consists of the following zones:
_ Requirements
Cleaning equipment manufacturing
You identify the following require merits for manufacturing cleaning equipment:
• Production is Make to Stock and must be scheduled at an operational level.
• Machine equipment is produced on an assembly line. Scheduling must be based on production orders.
• Finished products must be packaged and shipped directly from the warehouse.
• To reduce delivery times and excess inventory, equipment must be produced as needed.
• The ability to schedule production must be based on resource capacity and the availability of required materials.
• Production order operations must be scheduled to start only when capacity and materials are available at the same time and in the required quantities.
Liquid cleaning solution manufacturing
• Production is Make lo Order and is scheduled at the job level. Products must be manufactured in batches.
• Finished products must be packaged and shipped directly from the warehouse.
• You must be able to calculate the estimated consumption of ingredients and ensure that the
amount is divisible by the number of units the raw material «s available.
• Formula changes must be reviewed and approved. You must ensure that approved formulas cannot be deleted or edited. Approved formulas may be deactivated.
• An ingredient used to manufacture unscented cleaning solution is defined as a restricted product. You must be able to automatically print a product safety data sheet (PSDS) with the packing slip for any order that includes unscented cleaning solution.
• Production must be scheduled to start by date and time according to the order that is specified by the production route.
• You must implement a scheduled Kanban rule that meets the following requirements:
o Prevent overloading a work cell for scheduled Kanbans. o Visualize excess inventory in a supermarket.
o Store products in supermarkets before they are consumed or shipped.
• You must link relevant financial dimension data to the inventory transactions at each site to ensure that you can trace profit and loss figures directly to East site and West site respectively.
• You must set up production operations for sub-contracting of Pine scent and Orange scent solution to Vendor A to ensure that a purchase order is automatically created based on estimation of a production order.
Costing
• The price of raw materials used for manufacturing unscented cleaning solution must be tracked based upon commodity exchange pricing. The margin and cost multiplier must be set up for commodity traded raw material.
• You must set up cost calculation groups to ensure that indirect costs that originate in the manufacturing of finished goods are recognized and absorbed into the product cost.
• The production manager needs to set up picking list journals and BOM item consumption.
Reporting
• Production control parameters must be setup for reporting of automatic BOM and Route consumption.
• You must create reports that include information about cost records and categories for items, and calculation formulas for indirect costs.
• You must treat manufactured items as purchased items for cost roll-up purposes during BOM calculations and reporting.
• You must configure automatic route consumption in connection with the automatic running of Report as finished.
Inventory control
You must not be required to track the tot number for items when you enter inventory information into the system. Lot numbers for items must be entered when items are picked from inventory.
Issues
Users report the following issues:
• The production manager observes that items are being deducted from inventory two times on production jobs. A shop supervisor mistakenly registers the process for assembling batteries for the pressure washers to Registered as prepared. You must reschedule the process for a future date.
• Customer1 orders 20 barrels of unscented solution. The order is confirmed. Production must be scheduled to start on December 21 to meet the customer’s delivery deadline.
• User2 reports that costs for manufactured items are twice as high as expected.
• User 1 reports that the formula for the liquid cleaning solution sometimes changes during production. You must enforce the policies regarding formula editing for current and future use.
You need to plan scheduling for Customer1’s order of unscented solution.
What are two possible ways to achieve the goal? Each correct answer presents a complete solution. NOTE: Each correct selection is worth one point.
- A . Schedule production based on the availability of raw material.
- B . Split and plan operations in detail for each of the resources.
- C . Schedule productions based on the capacity of the resources.
- D . Run master planning with a specific time fence.
- E . Plan scheduling of the production at the resource group level.