NACE NACE-CIP2-001 Übungsprüfungen
Zuletzt aktualisiert am 26.04.2025- Prüfungscode: NACE-CIP2-001
- Prüfungsname: Coating Inspector Level 2
- Zertifizierungsanbieter: NACE
- Zuletzt aktualisiert am: 26.04.2025
Question #11
Corrosion is the reverse process of
- A . hot dipping.
- B . steel manufacturing.
- C . flaking.
- D . galvanic deterioration.
Question #12
In the event of a conflict between the Product Data Sheet and the Specification:
- A . The Product Data Sheet prevails
- B . The Specification prevails
- C . It is up to the Inspector to decide which one to follow
- D . It is up to the Applicator to decide which one to follow
Question #13
Thermal Spray coatings provide:
- A . Barrier protection
- B . Inhibitive protection
- C . Sacrificial protection
- D . Thermal protection
Question #14
The primary purpose of Fireproofing coatings are to provide:
- A . fire extinguishing characteristics
- B . Temporary protection for the structure
- C . Preferential fuel for the fire
- D . Explosion resistance
Question #15
Examples of non-ferrous metals include
Select All that Apply:
- A . mild steel.
- B . aluminum
- C . iron
- D . copper
Question #16
Cold-applied tape
- A . are identifiable by its distinct colors, usually light blue, green, Or Grey.
- B . is typically green or led and looks like “painted" finish.
- C . have a cross-linked polyethylene backing and a heat-activated adhesive.
- D . is polyethylene film, heat laminated, ‚With an adhesive layer of butyl glue.
Question #17
Which product, is used in conjunction with other coatings such as FBE when the lines run through wetlands or a body of water?
- A . 2-Layet Polyethylene (PE)
- B . 3-Layet Polyethylene (PE)
- C . Concrete
- D . Coal Tar Enamel
Question #18
The most likely area of failure on a buried external pipeline coating is the:
- A . Mainline coating
- B . Field joint coating
- C . Areas exposed to Ultra Violet light
- D . Ground bed
Question #19
You are the NACE Level 2 Coating Inspector where SSPC PA 2 has been specified with an additional requirement that no individual gauge reading shall be below a certain value.
As this is not part of the standard you should:
- A . Ignore the additional requirement
- B . Enforce the additional requirement
- C . Call your supervisor
- D . Request clarification from the specifier
Question #20
Non-Conformance Reports are designed to:
- A . Punish the Contractor for substandard work
- B . Elevate the status of the Inspector
- C . Assist the Owner in negotiating credits from the Contractor
- D . To identify items that do not meet the specification requirements