Question #21
Question #22
NACE Standards include:
- A . Standard Practices
- B . Material Requirements
- C . a) & b)
- D . a) only
Question #23
The number of air turns in an enclosure can be affected by all of these EXCEPT
- A . time of the year (winter/summer).
- B . type of dehumidification equipment (refrigerant or desiccant).
- C . manufacturer of the equipment.
- D . coating type.
Question #24
From a corrosion perspective, the main difference between Ferrous and Non-Ferrous Metals is:
- A . Cost
- B . Iron content
- C . Appearance
- D . Safety
Question #25
You have just your NACE CIP Level 2 certification when you are asked to supervise a team of uncertified field pipeline inspectors.
Your FIRST preferred course of action is to:
- A . Accept assignment without hesitation
- B . Advise the prospective employer that you cannot accept the position
- C . Meet with the prospective employer to scope of your role
- D . Review the NACE Attestation prior to making a decision
Question #26
On pipelines, which coating is identifiable by its distinct colors, usually light blue, green, or grey?
- A . Liquid epoxies
- B . Heat-shrink sleeves
- C . Concrete
- D . Coal Tar Enamel
Question #27
Surface preparation methods for Non-ferrous metals are:
- A . The same as for Ferrous metals
- B . The same for all Non-FetT0us metals
- C . Specific for each type of Non-ferrous metal
- D . Not required
Question #28
WJ-1 is always performed using UHWJ at pressures above 210 MPa (30,000 PSI)
- A . True
- B . False
Question #29
Inspection and Test plans are developed by referencing:
- A . The Specification, TDS, relevant Standards and Codes
- B . The Specification, SDS, relevant Standards and Codes
- C . The Specification, Application Guidelines, ‚Relevant Standards and Codes
- D . The Specification, Safety Manual, Relevant Standards and Codes
Question #30
An Inspection and Test Plan is required when:
- A . It is always required
- B . When the Coating Applicator requests one
- C . When the Owner specifies one
- D . When the Inspector requests one